Projects: 9 July – 15 July

As we get back into the swing of blogging about the stuff going on up here, we’re juggling a lot this week:

Restoration:

  1. Finish formulas and patterns for the faux marble in main stairwell entrance.
  2. Clean, repaint, and refresh office area in Workrooms
  3. Design Deco sculptures for front entry to either be cast in bronze or paster and then gilded.

Sewing Classes:

  1. Lots of Open Sewing Studio time scheduled… 9 July, 10 July, 13 July, 14 July
  2. Verena’s ongoing wedding dress gets special attention this week – this week the skirts go in and she’ll be inserting the two zippers and starting the drape around the neckline
  3. Amber’s wedding dress is a last-minute addition to classes this quarter – it is substantially simpler than Verena’s dress, so we said yes to the dress and threw it into the mix.  Welcome to the crazy Summer dress party, Amber!

Clothing & Design:

  1. This is going to be the Summer of custom dress shirts. I may even sneak a few in for myself.
  2. Two words: Linen pants
  3. We’ve been playing around with tambour and some smocking techniques in new ways for a new private collection

Agricultural Stuff:

  1. Drafting out masonry heater and fireplace plans for the cabin
  2. Planning out garden and deck areas
  3. Late Fall schedule set for November – December work

General Business Stuff:

  1. Fall registration under way
  2. Summer studio time registrations
  3. Daily blog and social media entries

And that is the week, folks.  Let the glamour wash over you like a waterfall of glitter and delight.

 

 

 

Projects: 26 May – 1 June 2014

A lot going on this week:

Workroom:

  • Spring session ends this week
  • General cleaning and straightening
  • Classes blog back up and running
  • Summer registrations for classes open to the general public on 27 May
  • All sewing machines serviced for the next session

Gallery:

  • We are going to be rehabbing the gallery for a film shoot.  Alec, one of our former students is going to be shooting a short and we have to temporarily change the configuration of the room for Sartre’s No Exit.  Luckily it will just take a little work to seal up the windows and doors.  We shoot on 3&4 June.

Getaway Farms:

  • The mulch order is coming in – about 21 cubic yards of wood mulch from Expedition Log Homes.  Our goal over Thursday and Friday is to have the berm on the front of the property set and ready by Saturday morning.

Just IMagine:

  • Geno is coming out to the farm on Thursday.  We’ll probably use our time with him to show him how to mulch and plant the remaining trees from last week.  He is getting really good at driving the tractor, so he will be our intra-farm transport and delivery for the afternoon.
  • Nicole and Alia are going to be working with the horses – grooming and round-pen.  Both of them are feeling much more confident; it is great to see them progress so far.

General Tchad® stuff:

  • All blogs back online and ready to go
  • About ten thousand emails about Summer classes

And that’s it!  Go!  Gogogo!

 

 

Projects: 22 August – 4 September

We will be spending the two weeks leading up to the Fall 2011 class session prepping the workroom and getting things together for the up-coming ten-week session.

On the agenda for the week:

  • Getting the rest of the estate settled.
  • Getting the workroom set up for classes.
  • We have started a new blog called Rural Pursuits to cull information about rural living. Stay tuned.
  • We will be working on the class schedule for the next two quarters (Winter and Spring 2012).
  • Email and general blog & Web stuff.
  • Tchad will be developing more with his personal blog and should be able to introduce the Wrought blog by the end of September.
  • There is a short video instructional series that we have been invited to work on.  It is a series that gives short creative video tips to working business women.  We will be able to tell you more about that in the coming weeks.

We will be putting our clothing business on hold for the next few months, so will not be taking consults or orders until at the very earliest late Spring 2012.  This is going to delay the roll out of the design blog, but we want it to be right, not just published.

So it is a fairly straightforward couple of weeks for us up here at Tchad.  Stay tuned for more.

In the meantime, you can always email us at:

tchad@tchad.biz or classes@tchad.biz

or you can text us at: 773.680.5914.

This should be an exciting Fall and Winter!  Let’s see what we can make happen!

 

Resurrection!

It has been since March.  We had to drop the blogs because of a death in the family.

The process hasn’t been fun.  If you want to read more about that you can do it on Tchad’s personal blog.

But as of now, the blogs are back up and running!

We are re-structuring the business to deal with classes entirely.  There will be no clothing or design projects for a while as we deal with the personal and professional fall-out of a life change like this.

So enjoy the blogs and let’s see where this takes us!

Projects: 11-17 October 2010

Some of our projects at the workroom the week of 11-17 October:

  1. Our email inbox has become a mess. If you expect an email, look for it by 3 p.m. Tuesday the 12th.
  2. We should have the Design blog built out.
  3. The tchad.biz site will be updated with new links and filled out with some images.
  4. There are about five posts to write across the blogs:
    1. Sewing machines you should never buy.
    2. Sewing machines that are a great value.
    3. Reviewing the “Pattern Magic” book’s new English edition.
    4. How to build an ironing table from a large 4×8 foot piece of plywood
  5. Toward the end of the week, we will be at the fabric store to buy white fabric for the workroom’s office drapery.
  6. What seems like thousands of little business details – CPAs, attorneys, &c.
  7. Fittings Friday morning for two of the Berlin series (this is VERY exciting).
  8. Rescheduling and updating the class schedules for Winter & Spring 2011.

So that is what HAS to get done. If we can squeeze in a few hours to finish cleaning out the closet and install a new communications system in the workroom, well, great.

“Project Envy” Shoot…Out-takes

As the blogs at Tchad LLC gain some traction folks are taking notice. We have gotten some emails here and there, but the funniest thing happened Tuesday morning.

Lisa Helms called us and said something like: “HEY! I see your blog! I am on my way up with my projects!” I want to be on the front page, too!

Lisa, a freelance graphic designer of some note and experience, is an old friend and supporter of the Tchad concept and was one of our first students in the early days. We aren’t very good at taking pictures and documenting things, so her contribution was more than welcome as we put out the word for pictures of student design and sewing projects.

When you have students who aren’t professional models, it can be hard to get them to pose well. You end up with a lot of awkward and stilted shots that aren’t flattering.

please don't kill us for using this as an example...

You have to loosen folks up a bit.

lisa laughing

Fun with photos

So after a number of shots that neither of us liked, Tchad hit on an idea.

With a camera in one hand and the nearest piece of yardage in the other, we shouted:

“HEY! LISA! CATCH!” as we lobbed the fabric in the air.

So we suppose the moral of the story is:

If you want people to act naturally and photograph well, throw things at them.

Fabric:

hey! catch!

4 yards of silk lining will loosen you up!

Notions…

Lisa tries to catch something thrown at her.

OMG OMG OMG

Thread…

Thread catch

We should really have aimed better...

lisa playing catch

Agh!

Don’t forget it is about fun, guys.  Don’t forget it is about fun.

Like Emerging From Purgatory…

When we took over the spaces at 4403 N Sheridan in 2003, we started small.

Really small.
Like 210 square feet kinda small.

View of original workroom

Original Workroom #203

Borris Powell in #203

Draughting!

This is the first space we had: #203. That’s right: 7×30 feet. We weren’t running full classes at the time – Tchad was still working for VSM International, the company that manufactures Viking brand sewing machines and couldn’t take the time to expand with his corporate job. The only students who have seen this space were our dedicated design students: Borris Powell (of
Borris Powell Designs) and Amanda Kezios (of Mojospa).

We were working with a number of private clients, but we were strictly using #203 as a factory in miniature. All of our fittings and deliveries were taken directly to the client so they didn’t have to deal with cramped quarters. Scores of dresses and interior projects came out of this little space.

Tchad Floor Stamp

Making one's mark.

All of that changed in the Spring of 2004 when #205, the space to the North opened up. Tchad had quit his job teaching for VSM and was ready for a challenge.

Skylight

OH! A skylight

Well, a challenge is certainly what we got.

After the drop ceilings came down, we got a real sense of what we were up against. Turns out the ceilings had been put up for a reason. We aren’t terribly fond of the “it’s good enough for government work” mentality that permeates the Ohio River Valley we grew up in, so we rolled up our sleeves and got to work.

This had to be right.

Almost makes "The Rat Incident" worth it.

When you start a rehab project, you should anticipate surprises. Sometimes they are expected, like when you find out that some joker has cut the electric lines and there they sit – quite live. Sometimes they are unpleasant, like when you find a desiccated rat tangled in a pair of size 34-waist men’s briefs (sorry, no pic but: yes. Yes we did. Our first thought: “Fruit-of-Rat’s-Tomb” we aren’t terribly clever here). And sometimes you are very pleasantly surprised, like when you discover a large 2.5×6 foot functioning industrial skylight under your dropped ceilings.
Jackpot.

Now…

We had written a long, drawn-out spiel about what and how we grew from #203 to #201-209.

We were going to drone on and on about the first expansion when we took over #205 and added it to #203, then the second expansion when we took over #207, then the heartbreak of taking over #209 (it had been used as a hiding-place for feral cats). We were going to post and boast of the joy of laying lime plaster and our crazy skills with hanging 5/8″ drywall single-handed. Maybe some things about how we developed a method to eliminate basebaords and door trim. Some kind of celebratory look-at-us when we finally expanded to our physical limits and took over #201.

There was going to be something here about how we single-handedly rehabbed the building’s public restrooms with pictures that would make the world’s most jaded DCFS agent cringe.

We were going to write about the struggle of self-financing this much work and the pride we take in doing things for ourselves and how we feel that the creative community in general is held back not by a lack of spirit, but rather by a lack of functional knowledge of how to make things happen instead of relying on others or complaining/inventing excuses.

Throw in a few paragraphs about having had to scale back the client-side of the business since 2007 for lack of infrastructure, time, or energy and how that has held back our design work for three years.

All of it with pictures documenting our work, pain, and progress.

But no.

We are chomping at the bit to get everything underway.

Let’s let a couple of pictures speak for themselves.

Dust masks are trés fashionable!

How Tchad has looked for the past three years when not teaching classes.

After dropped ceilings came down

Bad. Really bad. Everything looked like this.

So here we are, writing about this in late September of 2010.

We have moved on, grown up, and:

Our space is set and we are ready to go.





NEW SPACE!

201-203

Gallery & Workroom...

209 Tchad Chicago Classroom

Classroom

New Classroom!

Classroom 209

Let’s do this!

We are working on it!

So the old general Tchad.biz blog just wasn’t cutting it and here we are.
The blogs have been divided up into separate sites for Projects, Classes, and Design. This is going to be the first post for each of them.
This has turned out to be the default image when we are working on stuff:

Coping Marble at the Sheridan-Montrose building in Chicago.

*chip*chip*chip* We are getting there! *chip*chip*chip*

That’s right. Coping Marble. This pic was from the 2007-8 bathroom restoration at the Sheridan-Montrose building where we have our workrooms. What you aren’t seeing is the aftermath…

After having coped out the perfect ridge in the base of the 2 inch marble slabs, we stood it up and walked over to another part of the hall… CRASH …and a 100 year old piece of marble crashed into hundreds of pieces.

Hopefully the build-outs of the blog will go better.